Posted: November 30th, 2022

 Coursework Tasks to be Completed by Students You are required to write an indiv

Place your order now for a similar assignment and have exceptional work written by our team of experts, At affordable rates

For This or a Similar Paper Click To Order Now

 Coursework Tasks to be Completed by Students You are required to write an individual report including the following: A. For the Smith’s Dock site at North Shields in Newcastle, the project aims to develop a sustainable  housing scheme with consideration for inclusive living B. Analyse the project and propose an appropriate Modern Methods of Construction (MMC) and  offsite construction methodology for the project. Your proposed method needs to be justified by  providing the advantages of the method for the project. C. Identify 3 major challenges in the planning, design and construction phases of your project that  can be addressed by Building Information Modeling (BIM). The challenges must be specific to  Smith’s Dock site and the project option, and the MMC method that you selected. D. Describe the potential consequences of not properly addressing the three challenges to the  project time, cost, quality, safety, sustainability, and/or productivity (you need to clearly explain how  each challenge could negatively impact one or more of these items).  E. For each challenge, develop a BIM-enabled solution and describe how BIM can address the  challenge, and improve project time, cost, quality, safety, sustainability, and/or productivity. The  solutions must be tailored to the Smith’s Dock project, and your selected project option. You can  exemplify the solution with some illustrations from the BIM model you develop for the Smith’s Dock  project.  The report shall include the following sections: – Section 1. Executive Summary o This section provides a brief introduction about the project, the proposed MMC method,  the type of the challenges you identified, and a brief description of your solutions.  o The maximum word count for this section is 500. – Section 2. Proposed MMC Method o This section describes what MMC and off-site construction methodology you propose for  the Smith’s Dock project, and the reasons for proposing this method along with its  advantages for this project (item B above) o The maximum word count for this section is 750. – Section 3. Identified Challenges o Challenge 1: Description of the challenge and its consequences (item C and D above) MCE | Learning and Teaching Page 3 of 4 o Challenge 2: Description of the challenge and its consequences (item C and D above) o Challenge 3: Description of the challenge and its consequences (item C and D above) o There is no word count limit for this section. – Section 4. BIM-enabled Solutions: o Solution 1 to Challenge 1: Description of the solution to challenge 1 (item E above) o Solution 2 to Challenge 2: Description of the solution to challenge 2 (item E above) o Solution 3 to Challenge 3: Description of the solution to challenge 3 (item E above) o There is no word count limit for this section. – Section 5. References: oFollow the referencing style specifified below. The number of words in the reference section  does not count.  

For This or a Similar Paper Click To Order Now

Expert paper writers are just a few clicks away

Place an order in 3 easy steps. Takes less than 5 mins.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00