Civil Engineering

14.what is the purpose of preparing a “feedback” report?

1.Evaluation of the contractor’s schedule submittal should be limited to what three principal concerns? 2.Why is it desirable to prepare an inspection plan prior to construction? 3.What basic equipment (not furnishings) should be required in construction field office? 4.A project has field trailers for the Resident project Representative at the construction site and an off-site […]

Read full post

Date: September 14th, 2022

Scope-In this assignment, I would like you to find a paper or other documentation that describes an actual civil or building engineering project where significant cost, schedule or scope overruns occurred. Projects with severe cost, schedule, or scope overruns can provide good examples of lessons learned

Scope-In this assignment, I would like you to find a paper or other documentation that describes an actual civil or building engineering project where significant cost, schedule or scope overruns occurred. Projects with severe cost, schedule, or scope overruns can provide good examples of lessons learned. I highly encourage you to find a project that […]

Read full post

Date: September 8th, 2022

Rayleigh-Ritz method

a) Rayleigh-Ritz method b) Determine the buckling coefficient “K’ c) What would be the solution for the deflection if the plate is only subjected to a concentrated load “p’?

Read full post

Date: August 22nd, 2022

The overall task is to develop two integrated energy conservation packages: one for retrofitting a single energy inefficient domestic dwelling, the other is to build a new development with 50 houses based on the same building type from the retrofit following the requirements of the Building Research Establishment’s Home Quality Mark system.

Sustainable Design & Construction (Quantity Surveying) The overall task is to develop two integrated energy conservation packages: one for retrofitting a single energy inefficient domestic dwelling, the other is to build a new development with 50 houses based on the same building type from the retrofit following the requirements of the Building Research Establishment’s Home […]

Read full post

Date: August 4th, 2022

Supervise the planning of on- site building and construction work.

Supervise the planning of on- site building and construction work. The task is in Construction Field. the task needs to be done is in the file called “assessment”, others are just support files. Just for clear purpuses, we need to handle all tasks mentioned in the assessment file, the location is in Queensland, Australia. And […]

Read full post

Date: July 26th, 2022

Monitor costing systems on complex building and construction projects.

Monitor costing systems on complex building and construction projects. The task is in Construction Field. the task needs to be done is in the file called “assessment”, others are just support files. Just for clear purpuses, we need to handle all tasks mentioned in the assessment file, the location is in Queensland, Australia. And need […]

Read full post

Date: July 26th, 2022